Technical Audits of two EDF Funded Road projects – Lilongwe – Nsipe and Mzuzu Urban road in Malawi

Country: Malawi

Year: 2009 - 2011

Beneficiary: National Authorizing Officer of the European Development Fund

Mission objectives:

·   Ensure the conformity and quality of the contractual documents

·   Ensure the conformity of the services rendered with the financing agreements

·   Ensure the technical quality of the outputs in relation to the expenditure made.
 

Technical Audit of Addis-Ababa/Jima Road Rehabilitation Project in Ethiopia

Country: Ethiopia

Year: 2009 - 2010

Beneficiary: EC Delegation to Ethiopia

Mission objectives:

·    Ensure, by traditional audit methods, the regularity of statements, requests for advance payments and invoices

·    Check The quality of the setting out of works and its adherence to the drawings; the consistency between the as-built drawings, the works actually carried out and the quantities accounted in the interim certificates of payment

·     Make an assessment of claims raised by the contractor and an evaluation of the amicable settlement to be signed/signed between the Contracting Authority and the contractor

 

SUPPORT SERVICES TO THE NAO-SUPPORT UNIT INFRASTRUCTURE SECTION - MALAWI

Country: Malawi

Year: 2009 - 2010

Beneficiary: National Authorizing Officer of the European Development Fund

Mission objectives:

·    Ensure Delivery of commitments and targets on time and within budget.

·    Ensure Effective and efficient infrastructure project delivery, implementation and monitoring under the EDF programme in Malawi.

·    Ensure Timely preparation, launch, technical evaluation and award of its portfolio infrastructure service, supplies and works tenders

·    Ensure Adequate direction, management, monitoring, audit and evaluation of its current programmes and projects and in so doing meet all internal, GoM and EC reporting requirements

 

EVALUATION DU PROJET D'APPUI AU PROGRAMME GABONAIS D'ENTRETIEN ROUTIER ET APPUI A L'IDENTIFICATION / FORMULATION DU PROJET 10 FED

Pays : République du Gabon.
Année: 2010

Bénéficiaire: la Délégation de la Commission européenne au Gabon

Objectifs du projet:

·    Une analyse détaillée sur l’avancement du projet et sur les engagements du gouvernement (sur la base des indicateurs décrits dans la convention de financement et d'autres qui pourraient être considérés pertinents),

·    Recommandations du consultant sur les modalités à privilégier dans l'intervention de la Commission Européenne dans le sous-secteur entretien routier dans les années à venir (programme 10ème FED),

·    Préparation d’un projet de fiche d'identification pour une éventuelle prolongation de l'appui dans le cadre du 10ème FED suivant les modèles habituels de la Commission européenne,

·    Préparation en fonction des résultats de la phase d'évaluation et identification, d’un projet de fiche d'action en vue d'un possible financement 10 FED.

 

Assistance technique pour le compte du ministère du transport de transport pour la formulation d'un projet de jumelage institutionnel dans le domaine de la gouvernance économique du transport

Pays : Tunisie

Année: 2010

Bénéficiaire: Le ministère de transport

Objectifs du projet:

Identification et la formulation d’un projet d’appui institutionnel à réaliser dans le cadre d’un jumelage traditionnel, visant le renforcement des capacités de la DGPE dans le suivi du secteur

 

ETUDE DE L’AMELIORATION DE L’ORGANISATION DES TRANSPORTS ROUTIERS DE MARCHANDISES EN COTE D’IVOIRE

Pays : Côte d’Ivoire

Année: 2010

Bénéficiaire: Le ministère de transport et la Société Nationale des Transports Terrestres

Objectifs du projet:

·   Permettre une compréhension, par l'ensemble des parties prenantes du secteur, des raisons qui conduisent à la surcharge des véhicules, qu'elles soient d'ordre économique, d'ordre réglementaire   (dysfonctionnement), ou de capacités des acteurs…

·     Rechercher les mesures réalistes pour l'optimisation des transports routiers de marchandise afin d'obtenir des services de qualité satisfaisante, respectant la réglementation et à coût minimum. Il s’agit en particulier de réduire les entraves au transport routier afin de diminuer les surcoûts, favoriser la transparence et la concurrence dans l’attribution des transports, et imposer un minimum de niveau de service.

 

Audit de sécurité routière - Projet ADM VI

Pays : Maroc

Année: 2010

Bénéficiaire: La société Nationale des Autoroutes au Maroc ADM

Objectifs du projet:

La mise en œuvre d’un audit relatif à la sécurité routière, qui consistera à la vérification indépendante, détaillée, systématique et technique de la sécurité portant sur les caractéristiques de la conception de l’autoroute.

 

Technical Assistance for qualitative/technical and financial monitoring of one works contract (Podgorica by-pass)

Country: Montenegro
Year: 2009 - 2011

Beneficiary: The Municipality of Podgorica.       

Mission objectives:

·    Upgrade a key transport infrastructure and improve regional traffic flow conditions, thereby promoting economic growth, particularly through development of the tourism market.

·    Perform a qualitative/technical and financial evaluation of the activities implemented by the Works Contractor for the "Construction of Eastern Podgorica by-pass – Section 4".

 

Technical Assistance to Support the Turkish Ministry of Transport in IPA Programming

Country: Turkey

Year: 2009 – 2010

Beneficiary: Ministry of Transport

Mission objectives:

·    Support Turkey’s effort towards accession and facilitate the pace of legal alignment and its implementation via institutional capacity building

·    Establish a sector strategy in the field of road transport to support the programming process for the Turkish Ministry of Transport (MoT)/Directorate General for Land Transport (DGLT).

 

Formulation study for protective road & bridge works

Country: Sierra Leone

Year: 2009 - 2010

Beneficiary: Sierra Leone Roads Authority

Mission objectives:

·    Provide the decision-makers in the Government of Sierra Leone and the European Commission with sufficient information regarding the proposed priority road & bridge infrastructure project:

·    Assessment of the relevance of the proposed project to address the problems identified at institutional, economic and social level and any additional problem arising in the road sector);

·    Detailed analysis of the technical, economic and financial, institutional and management, environmental and social feasibility of the proposed project;

·    Detailed analysis of the potential sustainability of the expected project objectives and results;

·    Review of the existing typical cross-sections and priced BoQ, additional design elements and tender documents for the works (one tender) according to EDF guidelines.

 

Restructuring and Development of Croatian Railway System within the framework of EU legislation - Staff Training Infrastructure Manager”

Country: Croatia

Year: 2009 – 2010

Beneficiary: Ministry of Sea, Transport and Infrastructure

Mission objectives:

·    Prepare Croatia to fulfil the requirements of European Union membership in particular adherence to the acquis communautaire in railway sector.

·    Technical assistance, support and training to the Ministry of Sea, Transport and Infrastructure, and the body of Infrastructure Manager (i.e. HŽ Infrastruktura d.o.o.).

 

Actualisation du cadre législatif et réglementaire du secteur des transports en Algérie

Pays: Algérie

Année: 2009 – 2010

Bénéficiaires:Ministère des transports

Objectifs du projet:

·  la refonte des lois relatives aux transports maritime et portuaire ainsi que terrestres   dans le but de réformer le secteur en conformité avec les pratiques internationales et les engagements contractés (dans le secteur des transports ainsi que dans certains domaines connexes, notamment, au titre de l’Accord d’Association avec l’UE).

·  la proposition de dispositions réglementaires en application aux lois retouchées.

 

Diagnostic des états financiers du fond d'entretien routier

Pays: Tchad

Année: 2009 - 2010

Bénéficiaires: Le fond d’entretien routier (FER)

Objectifs du projet:

Présenter une opinion professionnelle sur la situation financière du FER à la fin de chacun des exercices annuels 2006/2007, 2007/2008,  2008/2009 et 2009, ainsi que sur les fonds reçus et les dépenses effectuées au cours des exercices clos les 31 Août 2007, 2008, 2009 et 2010 et sur les comptes bancaires ouverts au nom du FER.
 

Assistance Technique pour le suivi-contrôle du programme d’entretien périodique financé par le Fonds Routier pour les exercices 2008 et 2009

Pays: Bénin

Année: 2009 - 2010

Bénéficiaire:MDCTTP-PR

Objectifs du projet:

  • Réaliser le suivi-contrôle du Projet (contrôles administratifs et techniques du programme, audits financiers du Fonds Routier, évaluation de conditions de décaissement) appuyés sur les rapports des Commissaires aux comptes
  • Assurer le Ministre des Finances, Ordonnateur national délégué du FED et la Commission européenne de la bonne conduite du projet concerné, notamment :
  • de la conformité des prestations effectuées avec les dispositions de la Convention de financement n°9094/BEN et de son avenant;
  • de la bonne qualité des prestations exécutées; de la régularité et de la conformité des dépenses effectuées
 

Harmonization with EU norms of the legislation and standards of Georgia in the field of Civil Aviation

Country: Georgia     

Year: 2009

Beneficiary: Programme Administration Office (PAO)

Mission objectives:

Elaboration of a Twinning Project Fiche describing as clearly and as fully as possible the Project, the United Transport Administration intends to implement with the support of public technical assistance provided by an EU MS peer Administration.
 

Pre-feasibility study for the KAWAMBWA-MUSHOTA-LUWINGU (M3) road in Zambia

Country: Zambia      

Year: 2009

Beneficiary: Road Development Agency (RDA)

Mission objectives:

  • Justify acceptance, modification or rejection of an all-weather road from Kawambwa via Mushota to the M3 near Luwingu;
  • Select the preferred amongst different alternatives, on which to base the financing and implementation of the proposed intervention;
  • For the proposed project, identify and argue the tentative objectives, purpose, expected results and main activities;
  • Prepare complete documentation to allow formulation of the proposed project (including tender documents for feasibility study and detailed design) based on the best practise of work

  

Procurement and technical audit of road projects managed by the road development agency of Zambia

Country: Zambia

Years: 2008 – 2009

Beneficiaries: National Road Fund Agency (NRFA) and Road Development Agency (RDA)

Mission objectives:

  • Support the Government of Zambia's sector reform process regarding sector specific public procurement and the monitoring of quality delivery of civil road works.
  • Support the Government of Zambia with an independent and reliable procurement and technical audit of road transport interventions to assess sector specific public finance management issues and value for money aspects of civil works.
 

Etude sur les mesures d’accompagnement « genre » du projet de construction  de la route Garoua Boulaï – Ngaoundéré.

Pays :Cameroun

Année: 2009

Bénéficiaires:le Ministère de la Famille et de la Femme, Ministère de la Santé publique, le Ministère du Travail, les Ministères des Travaux Publics et celui des transports,

Objectifs du projet:

  • L’amélioration de la condition des femmes dans le cadre du projet Garoua Boulaï – Nandéké (86 km) financé par le FED et, le cas échéant, des tronçons Nandéké-Mbéré (financé par la BAD) et Mbéré-Ngaoundéré (financé par la Banque Mondiale).
  • La définition d’un programme de mesures ciblées sur le « genre » et cohérent avec les mesures mises en œuvre par la BAD et la Banque Mondiale sur les tronçons Nandéké-Mbéré et Mbéré -Ngaoundéré de l'axe Ngaoundéré – Garoua Boulai.
 

Mission de contrôle et de surveillance des travaux de réhabilitation du pont sur la rivière Milo

Pays :Guinée

Année :2008 – 2009

Bénéficiaire :l’Ordonnateur national du FED

Objectifs du projet :

Assurer le contrôle et la surveillance des travaux de réhabilitation du pont sur la rivière Milo à Kankan.
 

Audit technique de l'entretien routier au Tchad

Pays :Tchad

Année: 2008 - 2009

Bénéficiaire:Ministère des Infrastructures

Objectifs du projet:

  • Contribuer à l'amélioration de la qualité de service offerte par le réseau routier tchadien.
  • Permettre au Ministère des Infrastructures de maîtriser l'efficacité technique de l'entretien courant et d'avoir des recommandations permettant d'améliorer le dispositif existant.
  • Une vérification de la réalité et de la qualité des travaux par sondage, par visites et contrôles sur le terrain
  • L'examen du respect des procédures de passation des marchés, pour les contrats principaux et les éventuels avenants
  • Un examen de l'organisation, des procédures et du fonctionnement des services techniques intervenant dans l'entretien courant

 

Technical Audit of the EDF-Funded Roads projects in Malawi

Country: Malawi

Year: 2008 – 2009

Beneficiary: National Authorizing Officer of the European Development Fund

Mission objectives:

  • Provide assurance to the supervisor and contracting authority and the European commission is that the works have been completed in accordance with the related contract and that the supervision of the corks has been delivered in conformity with the supervision contract
  • Provide assurance of the conformity of the services rendered with the financing agreement, the contracts signed and any other document included in the tender for works and supervision

Contrôle et surveillance des travaux de construction du pont sur l’Alibori dans le parc du W (Bénin).

Pays :Bénin

Année :2008 - 2009

Bénéficiaires : Le ministère de l’Environnement et de la Protection de la Nature

Objectifs du projet :

 Superviser et contrôler, pour le compte du maître d’œuvre, la réalisation des travaux de construction d’un pont métallique sur l’Alibori dans la partie Béninoise du Parc Régional du W et de leurs voies d’accès en terre latéritique (longueur totale environ 0,6 km) ainsi que la construction de deux ouvrages de décharge (dalots double cadre 300 x 300).

 

Technical Assistance to support the Ministery of Transport in the development of short, medium and long-term transport policy and strategy, train Ministry staff in the process and review the MOT organisation in relation to policy making.

Country: Jordan

Year: 2008

Beneficiary: Ministry of Transport

Mission objectives :

  • Assistance in reviewing the National Transport Policy and Strategy for 2008 - 2010. 
  • Assisting the MoT in the methodology to be applied in the development of a medium-term and long-term transport strategy.
  • Advice on the optimal organisational structure, information flows and decision processes that will enable the MoT to most effectively develop policies and implement the appropriate strategies to achieve a measurable and successful outcome of the National Transport Policy.
  • Provision of training in transport policy and strategy.

Etude préalable à l'établissement d'une politique sectorielle des transports

Pays: Comores

Année: 2008

Bénéficiaire: Ordonnateur national

Objectifs du projet:

  • Un diagnostic fiable sur l’existant notamment en matière de routes
  • Une analyse du rôle du secteur des transports, précisant ses principales caractéristiques et son rôle dans le développement économique et social du pays et dans l’intégration régionale des Comores ;
  • Un projet de politique sectorielle horizon 2030 et développer un plan d’action 2009-2014
  • un ensemble cohérent de propositions en matière de législation, réglementation et les mesures d’accompagnement pour la mise en œuvre de la politique sectorielle. 
 

Etude de Préfaisabilité pour la réhabilitation du port de Brazzaville

Pays:Congo

Année:2007 - 2008

Bénéficiaire:Port Autonome de Brazzaville

Objectifs du projet:

  • Fournir suffisamment d’informations aux décideurs du Gouvernement et de la Commission Européenne, pour leur permettre de justifier l'approbation, la modification ou le rejet du projet de réhabilitation du port de Brazzaville en ce qui concerne la formulation de cette dernière.
  • Analyser la situation existante au PABPS du point de vue institutionnel et des infrastructures et compléter une étude de pré-faisabilité selon le model demandé par la Commission Européenne.

Etude de définition et de mise en œuvre d’une stratégie de contrôle des charges des essieux des véhicules lourds sur les réseaux routiers revêtus au Tchad

Pays :Tchad

Année :2007- 2008

Bénéficiaire :Ministère des infrastructures

Objectifs du projet :

  • Définir une stratégie d’aménagement progressif de stations de contrôle des charges à l’essieu des véhicules lourds sur l’ensemble des routes revêtues qui tienne compte de l’évolution programmée du réseau routier bitumé et de l’évolution du trafic.
  • Etablissement du diagnostic de la situation existante
  • Réalisation de la stratégie nationale pour le contrôle des essieux
  • Propositions de scénarios de configuration du réseau de stations

 Etude Organisationnelle et Fonctionnelle des Structures Techniques du Ministère Délégué, Chargé des Transports et des Travaux Publics auprès du Président de la  République avec Elaboration d’un Plan de Formation.

 Pays: Bénin

Année: 2007

Bénéficiaire:MDCTTP-PR

Objectifs du projet:

  • Améliorer la performance du MDCTTP, et plus particulièrement celles des structures et services impliqués dans le transport routier au regard des nouveaux défis et des nouvelles fonctions à endosser :
  • disposer d’un plan de réaménagement des structures et des rôles à assumer qui découle de la nouvelle stratégie (en cours de finalisation) avec une description des tâches des structures ;
  • disposer d’un plan de formation pour les besoins saillants et prioritaires, avec identification des opportunités et ressources correspondantes pour sa réalisation ;
  • disposer d’un schéma directeur d’informatisation de la DGTP avec ses liaisons intra ministérielles (SGM, DPP,..) et avec perspectives sur les liens essentiels externes (MDEF, INSAE,…) à créer et entretenir.
 

Master Plan Study for the national airports in Zambia

Country: Zambia

Year: 2007

Beneficiary: National Airports Corporation

Mission objectives :

  • Provide a long term plan for the development and upgrading of the designated airports to assure that investment and development projects are made in a prioritized and coordinated way in order to meet future traffic and customer demand

Etude économique du projet PROROUTES

Pays:R D Congo

Année:2007

Bénéficiaire:Ordonnateur National

Objectifs du projet :

Analyse de l’intérêt économique du projet PRO-ROUTES sur les premiers axes du réseau prioritaire qui seront rouverts et à déterminer s’il est effectivement opportun de procéder à leur aménagement selon le niveau de service décrit. 
 

Appui Technico-Institutionnel au Ministère des Infrastructures

Pays : Tchad

Année : 2006 - 2007

Bénéficiaire :Ministère des Travaux Publics et des Transports

Objectifs du projet :

  • Pilotage de la stratégie sectorielle des transports actualisée, en particulier :
  • lancement de la composante institutionnelle du 9e FED,
  • mise en place de la nouvelle stratégie d’entretien routier adoptée en décembre 2004,
  • Mise en œuvre de la composante « Investissements » du 9e FED, centrée sur l’axe économique Moundou-Doba-Sarh (300 km) et Sarh-Abéché.